How Cross-Border Trucking from Mexico Works
General information, not customs advice — rules vary by product and change often. Have a customs broker confirm the specifics for your case.
From the plant to the US dock
A northbound load at Laredo usually travels in legs, with the paperwork moving alongside the truck.
The Mexican leg
A Mexican carrier picks up at the plant and runs the load to the border. The trip travels with a Carta Porte, the electronic waybill Mexico's tax authority requires for freight moved on its federal roads.
The Mexican export
The exporter's Mexican customs broker files the export declaration, the pedimento, backed by the commercial invoice and the packing list.
The truck's manifest
Before the truck reaches the US port, the carrier sends its cargo information to U.S. Customs electronically: at least 30 minutes or an hour ahead, depending on the system it uses.
Across the bridge
At Laredo the trailer crosses the bridge, often behind a short-haul transfer tractor that runs only between the two border cities.
The US entry
The importer's US customs broker files the entry, under a customs bond, so the goods are released. Goods the FDA or USDA regulate need those filings in before the truck arrives.
The US leg
A US carrier takes the trailer on to its destination, or the freight goes into a Laredo warehouse to be transloaded onto a US trailer or stored.
Three ways a load gets across
A Mexico-based carrier needs separate authority to run past the US border cities and their commercial zones, and even with it can't haul domestic loads between two US points. So many loads change hands somewhere near the bridge.
Transfer at the border
The Mexican carrier drops the trailer in Nuevo Laredo, a transfer tractor takes it across to a yard in Laredo, and a US carrier picks it up there.
Transload in Laredo
The freight is unloaded at a Laredo warehouse and loaded onto a US trailer: to change equipment, to combine or split loads, or to wait for the US truck.
Through service
One carrier, or partners on each side, keeps the same trailer from the plant to the US delivery and changes tractors at the border.
Where the time goes
- The line haul to Laredo: Monterrey about 3 hrs · Saltillo about 4 hrs · San Luis Potosí about 7 hrs · Guanajuato (León / Bajío) about 8 hrs · Aguascalientes about 8 hrs · Querétaro about 10 hrs · Guadalajara about 11 hrs · Mexico City about 12 hrs · Puebla about 13 hrs.
- The wait at the bridge, which changes with the day and the hour.
- An inspection, when the load is picked for one on either side.
- The handoff in Laredo: the time until the US carrier hooks the trailer, or the transload.
- The US leg to the delivery address.
What drives the cost
- The Mexican line haul: the distance, the equipment, and how much freight is moving on the lane that week.
- The crossing: the transfer across the bridge and any waiting time.
- Customs on both sides: the Mexican export and the US entry, plus any duty that applies.
- The US leg from Laredo to the delivery address.
- Anything that waits: storage, a transload, or a trailer parked in a yard.
Where a Laredo warehouse helps
The two sides of a crossing rarely line up to the hour. A warehouse on the US side of the bridge keeps the load moving: the freight is transloaded to the US carrier the same day, stored and released as customers order, or the trailer waits in a yard until its US truck arrives.
We quote full truckloads from Mexico's manufacturing hubs through Laredo to your US facility, and our Laredo warehouse is the stop on the way when you need one.
Common Questions
Moving freight by truck between Mexico and the US. A load from a plant in Mexico usually travels in legs: a Mexican carrier from the plant to the border, a short move across the bridge, then a US carrier or a warehouse on the US side. The paperwork moves alongside it: the Mexican export, the truck's manifest and the US entry.
Only with authority to operate beyond the border. A Mexico-based carrier without it can run only in the US border cities and their commercial zones, which is why many loads change tractors in Laredo: the trailer goes on with a US carrier, or the freight is moved onto a US trailer. Even with that authority, a Mexican carrier can't haul domestic loads between two US points.
On the Mexican side: the commercial invoice and packing list, the Carta Porte for the trip, and the export declaration (pedimento) filed by a Mexican customs broker. At the border: the truck's electronic manifest, sent by the carrier before it arrives. On the US side: the entry filed by the importer's customs broker under a customs bond, a USMCA certification of origin when the goods qualify and the preference is claimed, and the FDA or USDA filings for regulated goods.
Electronically, before the truck reaches the US port: at least 30 minutes or an hour ahead, depending on the system the carrier uses to send it.
It depends on the product's tariff classification and where it was made. Goods that qualify under USMCA can enter without the regular duty when the importer claims the preference, and some products carry other duties on top. The importer's customs broker confirms it before the load moves.
The line haul to Laredo runs from about 3 hours from Monterrey to about 13 hours from Puebla. The crossing and the US leg come on top of that, and depend on the day, the commodity and the delivery address.
For when the two sides don't line up. The freight can be transloaded to a US carrier the same day, stored and released as customers order, or the trailer parked until its US truck arrives.